Topographical survey for the establishment of a photovoltaic farm
Legal entity
Jud. Dolj
10 December 2021
Execution of 3D topographic survey, 3D model, mesh, contour lines, orthophoto plan
For this project we used a topographic drone, rtk gps to obtain the information from the field and photogrammetry software for data processing, which took 4 hours. The result was a 3D model (mesh), an orthophoto plan at 1.5cm resolution, contour lines and topographic survey, which was handed over to the architect.
The data processing was done in a few hours resulting in orthophotos in .tiff format, 3d point cloud, which we processed in 3D spatial software plus 2D cad software.