Hotel construction in mountain resort
Legal entity
Jud. Argeș
20 July 2022
3D topographic survey, 3D model, mesh, contour lines, orthophotoplan
For this project we used a drone, rtk gps, 3D scanner to obtain the information from the field and photogrammetry software for data processing, which took 7 hours. The result was a 3D model (mesh), an orthophoto plan at 1.5cm resolution, contour lines and topographic survey, which was handed over to the architect.
Georeferenced orthophoto plan, topographic survey with 3d contour lines, point cloud