3D model, topographic survey with contour lines and orthophotoplan

Recent projects

Contact us

Project details

This case focuses on the 3D methodology for the production of accurate geographical data for the PUZ documentation that underpins the Building Permit.

Project objective

P.U.Z. documentation

Customer

Natural person

Location

Arefu, jud. Arges

Project date

08 December 2019

Services

3D scanning and modelling of the land in Arefu commune, jud. Arges for P.U.Z. documentation

Data acquisition

This studied area of 50000sqm required a 3D measurement of 120min. To ensure accuracy of 1-4 cm we used 25 RTK GPS points for further post-processing and error assessment.

Results

Image processing was done using specialised 3D software. GPS points determined in the field were used to generate a dense 3D point cloud georeferenced in the national reference system “Stereo 70”.

The following results were provided: a 3D model, georeferenced orthophoto plan, topographic survey with contour lines with equidistance of 1m